MHI Extends Deadline for EV Subsidy Claim Submissions Under EMPS-2024 and PM E-DRIVE
The Ministry of Heavy Industries (MHI) has provided an additional 45 days for filing claims under the EMPS-2024 and PM E-DRIVE schemes. The extension applies to specific invoicing and registration periods affected by technical or procedural issues.
MHI Extends Deadline for EV Subsidy Claim Submissions Under EMPS-2024 and PM E-DRIVE
The Ministry of Heavy Industries (MHI) has allowed a 45-day extension from October 29, 2025, for eligible claim submissions under the EMPS-2024 and PM E-DRIVE schemes. The approval was issued following requests related to delayed filings due to technical and portal-related difficulties.
People Also Search
What impact does the PM E-DRIVE scheme have on electric vehicle registrations in India?
How does the FAME 3.0 scheme differ from its previous phases in terms of budget and focus?
What are the key features of the operational guidelines for EV Public Charging Stations under the PM E-DRIVE scheme?
What financial support is allocated for the development of public charging infrastructure under the PM E-DRIVE scheme?
How does the government plan to enhance the electric vehicle manufacturing ecosystem through the PM E-DRIVE scheme?
Cases Eligible for Extension
According to the MHI circular, the following cases qualify for the extension:
EMPS-2024 (Multiple Logins Issue)
- Vehicles invoiced between June 5 and July 9, 2024.
- Registered on the VAHAN portal up to September 30, 2024.
PM E-DRIVE (Portal Stabilisation Issue)
- Vehicles invoiced between October 1 and November 8, 2024.
- Registered up to February 5, 2025.
PM E-DRIVE (Specific Date Window)
- Vehicles invoiced between February 21 and March 24, 2025.
- Registered by July 7, 2025.
PM E-DRIVE (Server and Antivirus Issue)
- Buyer IDs generated between June 21 and July 7, 2025.
- Registered up to October 5, 2025.
Conditions for Claim Eligibility
MHI clarified that the extension is valid only if all other scheme requirements are met.For EMPS-2024 cases:
- Claims can be filed only for production data and buyer IDs already uploaded in the EMPS-2024 portal.
- No new uploads or buyer ID creations are allowed.
- Aadhaar-based OTP authentication must be completed.
- EV models must meet PMP and EMPS-2024 compliance norms and possess a valid certificate at the time of manufacturing and registration.
For PM E-DRIVE cases:
- Claims are restricted to data and buyer IDs already uploaded on the PM E-DRIVE portal.
- No new entries are permitted.
- Aadhaar-based face authentication must be completed.
- EV models must meet PMP and PM E-DRIVE compliance norms with valid certification at the time of sale and registration.
Kunal Arya, Co-founder & MD of Zelio E-Mobility, said, “The extension announced by the Ministry of Heavy Industries reflects a mature and balanced approach to India’s EV transition. Policy systems and digital frameworks are still evolving, and moments like this show that the government is not only setting ambitious electric mobility targets but also ensuring the ecosystem has the operational runway to meet them. Support mechanisms that acknowledge ground-level challenges help manufacturers stay compliant without compromising efficiency, transparency or customer trust. It reassures the market that growth and governance can move hand-in-hand."
Sameer Modin - Founder & CEO of EVeium Smart Mobility, said, “The extension granted by the Ministry of Heavy Industries is a welcome and thoughtful step that recognises the realities of a rapidly scaling EV ecosystem. As the industry expands and digital systems evolve, technical bottlenecks are inevitable. What matters is a policy environment that listens, responds and ensures that genuine manufacturers and customers are not disadvantaged by procedural or portal-related challenges. This decision reinforces trust, brings operational fairness and strengthens confidence across the sector. It also signals that India wants compliance and discipline, but it also understands execution realities on the ground."
Implementation and Communication
The letter has been issued to M/s IFCI Ltd, the Project Management Agency (PMA) for both schemes. MHI has directed IFCI to inform all registered OEMs about the extension and ensure the necessary portal provisions are in place to facilitate claim submissions within the extended timeline.
Industry Reaction
Gaurav Rathore, Co-Founder, EVeez, said, "The Ministry of Heavy Industries has taken a very forward-looking decision to allow more time for the submission of claims for electric vehicles (EVs) subsidies under EMPS-2024 and PM E-Drive. The launch of every new e-bike, for instance, signifies a lot of intricacies involved in the process—sourcing supplies, manufacturing products, managing logistics, etc. Further, firms need to ensure that products meet safety standards and offer affordable rides to everyday users. Subsidy programs play a crucial role in making EVs financially viable."
Dev Arora, Co-founder & CEO, ALT Mobility, said, “The government’s extension of subsidy claim deadlines under EMPS-2024 and PM E-DRIVE, with an outlay of Rs 10,900 crore, comes at a crucial moment for India’s EV industry. The target to support nearly 25 lakh e-2Ws, 2.9 lakh e-3Ws, and over 14,000 e-buses reflects the government’s continued push toward mass electrification, but with sharper timelines. For the leasing and fleet-mobility ecosystem, this recalibration opens a powerful opportunity. Leasing will emerge as the bridge between affordability and scalability, enabling operators to spread upfront costs, secure predictable ROI, and manage residual-value risks as subsidies taper off."
Paras Shah, Co-founder & COO at Kazam, said, “The Ministry of Heavy Industries’ decision to extend the deadline for subsidy claim submissions under the EMPS-2024 and PM E-DRIVE programmes is a timely and progressive step for India’s EV ecosystem. This extension provides much-needed flexibility for manufacturers, partners, and end-users to complete documentation, align with scheme requirements, and fully leverage government incentives."
Bharath Rao, Co-Founder and CEO of Emobi, said, "MHI’s deadline extension for subsidy claim submission is a positive step for young electric two-wheeler brands like ours aiming for scale. Startups are working hard to localise components and expand dealer networks, so this additional time prevents genuine manufacturers from being disadvantaged by procedural delays."
Log in to post a comment.
End of Article
Trending
Toyota Glanza Facelift Variants Explained: What Does Each Variant Offer?
BMW Concept 7 Protection Armoured Sedan Unveiled
Toyota Glanza Facelift Launched in India: Top 5 Highlights
Toyota Glanza Facelift Launched at Rs 6.99 Lakh with Updated Design, Powertrain, Features and ADAS
Kawasaki Versys 900 Unveiled with Radar Based Safety System
Tata Motors, Stellantis India Sign Deal to Develop Vehicles for Global Markets
Hyundai Tucson N Line Debuts at 2026 Paris Motor Show: What's New
Popular
STAY UPDATED Get the latest news from Times Drive
